Remodel on Manufactured Home Add AC, Replace Furnace, Replace Duct-work Fallbrook, California
Details
Client Residential
Completed June 2018
Timeframe 1 week
Location Fallbrook, California
Third Generation Heating and Air Conditioning
,
Removed and disposed of existing equipment for a manufactured home, installation of new Trane 4 ton 14 Seer R410 Condensing Unit, Coleman 4 Ton Downflow Furnace, and Matching Evaporator Coil, replace thermostat with new Honeywell 4000 Programmable Thermostat, replace existing ductwork and crossover with new KD Rigid Galvanized sheet metal, relocate 2 vents, seal all connections.




